Preliminary business case for construction project
The preliminary business case sets out a justification for the investment that would be required by a potential development. It is used to decide whether the potential project merits being investigated in more detail.
A preliminary business case should be prepared very early in the project, before any decision has been made to proceed. It allows the client to explore high level options for meeting the requirements set out in the statement of need. This may include an assessment of comparable projects.
Experienced clients may have in-house expertise allowing them to prepare a preliminary business case. However, some clients will not have the full range of skills required and may wish to appoint independent client advisers to assist them.
A preliminary business case may include:
- Funding options.
- Legal agreements.
- Management structure.
- Objectives and mission statement.
- An assessment of constraints.
- Alternative solutions, such as refurbishment, or changing operational practices.
- A summary of options considered and discarded.
- Assessment of the main hurdles to surmount, show-stoppers, uncertainties and risks.
- Assessment of previous similar projects and lessons learned.
- Assumed procurement route.
- Assumed programme and phasing.
- A schedule of consultants that will be required.
- The market and competition.
- The budget, inclusions and exclusions and contingency allowance.
- A description of the business needs, benefits and keys to success and value.
- Public relations and external communications strategy.
- An assessment of any political consequences of the project.
- An assessment of the likely costs for the next stage.
- A proposal for the way forward.
- Relevant research, including assessment of similar facilities.
The preliminary business case is likely to be in a report format, however, where possible, information and requirements should be scheduled in a database or spreadsheet format that will be easy to expand and will be easy to use to test whether proposals satisfy requirements later in the project.
When, or if consultants are appointed, the preliminary business case should be updated to include their feedback and recommendations.
Once feasibility studies and options appraisals have been carried out by the consultant team, the preliminary business case should be developed into a full business case for the preferred option. The full business case is the document that will be used to obtain authority for the preferred option to progress to concept design.
[edit] Related articles on Designing Buildings Wiki
- Benchmarking.
- Budget.
- Business case.
- Cash flow.
- Client requirements.
- Constraints.
- Contingencies.
- Cost plans.
- Development appraisal.
- Feasibility studies.
- Funding options.
- Funding prospectus.
- Mission statement.
- Options appraisals.
- Risk.
- Risk management.
- Risk register.
- Whole-life costs.
[edit] External links
- OGC guidance on business cases.
- HM Treasury: Green Book, a framework for the appraisal and evaluation of projects.
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.

























Comments
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.